Write an end-preparation and termination record The record links rope construction to the finishing method, next assembly step and checks on both visible and hidden regions. Rope identity What to record: Fibre, braid, core, size, finish, colour, lot and sample code Project detail: ____________________ How to confirm: Match approved rope and production lot Preparation method What to record: Cut tool, heat or ultrasonic setting, stitch, whipping, adhesive or cap Project detail: ____________________ How to confirm: Record controlled work instruction Prepared geometry What to record: Preparation length, maximum tip profile, taper, exposed picks and hardness Project detail: ____________________ How to confirm: Measure and inspect marked samples Termination build What to record: Sleeve or fitting, insertion depth, fold, stitch or crimp setting and orientation Project detail: ____________________ How to confirm: Build with production tools Hidden containment What to record: Core and cover position before and after assembly, with permitted movement Project detail: ____________________ How to confirm: Section a retained sample Finished response What to record: Bending directions, pull condition, fraying, slip, hard edge and appearance Project detail: ____________________ How to confirm: Test complete terminations End preparation alone does not establish termination strength; the buyer must define load, durability and product acceptance for the complete assembly. Sinicwebbing — https://www.sinicwebbing.com