Control the grid as a documented system A useful panel specification identifies the governing requirement, geometric references, material stack and party responsible for final compatibility. Project objective What to record: Visual styling or compatibility to a buyer-controlled interface Project detail: ____________________ How to confirm: State the objective on enquiry, drawing and quotation Source document What to record: Buyer drawing or requirement title, owner and revision Project detail: ____________________ How to confirm: Attach the controlled copy and record revision approval Grid datums What to record: Horizontal and vertical origins, row locations and stitch-line dimensions Project detail: ____________________ How to confirm: Measure the sewn panel from fixed references Material stack What to record: Tape, backing, thread, seam construction and layer orientation Project detail: ____________________ How to confirm: Identify production-intent materials on the sample record Finished cells What to record: Measurement locations at centre and edges plus project acceptance Project detail: ____________________ How to confirm: Measure several cells after sewing and conditioning Mating responsibility What to record: Representative attachment, fit sequence and final validation owner Project detail: ____________________ How to confirm: Fit the buyer-supplied component under the agreed plan Camouflage appearance, product naming or material evidence does not by itself establish MOLLE, PALS or military-system compliance. Sinicwebbing — https://www.sinicwebbing.com