Locate every ridge and channel against its interfaces Record the relief as measurable geometry tied to a face, datum and finished strap layout. Base construction What to record: Fibre, weave, finished width, thickness, edge, stiffness and face Project detail: ____________________ How to confirm: Retain a marked full-width sample Relief geometry What to record: Groove count, spacing, width, depth, ridge profile and direction Project detail: ____________________ How to confirm: Measure from the stated datum Hardware mapping What to record: Part number, slot and bar positions, entry angle, folds and travel range Project detail: ____________________ How to confirm: Overlay hardware on the drawing Sewn or printed zones What to record: Seams, labels, logos, plain margins and allowed crossings Project detail: ____________________ How to confirm: Build the worst-case crossing Use and cleaning What to record: Contact surface, likely debris, cleaning method and drying state Project detail: ____________________ How to confirm: Run the representative sequence Assembly acceptance What to record: Tracking, adjustment, stitch formation, visible relief and surface change Project detail: ____________________ How to confirm: Inspect the complete strap path Any holding or adjustment criterion belongs to the exact tape-and-hardware assembly and buyer-defined method; grooves do not create a universal grip claim. Sinicwebbing — https://www.sinicwebbing.com